Year

2009–2010

Size

1,108 m² quay deck, including a sloping apron and anchoring slab.

Scope

Detailed design.

Specification

Ranyard Maritime expanded its quay capacity by constructing a new concrete piled quay. The quay was designed to serve as a shipping quay for heavy equipment destined for the offshore oil and gas industry in the Stavanger region. Nyvoll Consult AS was responsible for the detailed engineering design.


Design data:

  • Design live load: 50 kN/m²
  • Quay length: 80 m
  • Concrete-filled tubular steel piles with diameters of 610 mm and 711 mm, and wall thicknesses of 12.5 mm and 14.2 mm, respectively, with lengths ranging from 20 m to 35 m
  • Pile spacing: 6.8 × 12.5 m

Contract Type

Design and Build (Turnkey Contract)

Nyvoll Consult AS

Svein Ove Nyvoll

Client

AF Anlegg as

Contact Persons

Lars Gunnar Andersen Erdil Kenar