Pier Tjuin and Follafoss smolt facility

Year

2020

Size

New quay for the smolt facility at Tjuin and new mooring dolphins at the quays in Follafoss, Trøndelag.

Scope

New quay with mooring dolphins, including two freestanding 50 tonne mooring bollards on each side, and one additional mooring dolphin at each quay in Follafoss.

Specification

Nyvoll Consult AS was appointed as the structural engineering consultant by Consto Anlegg Nord for the construction a new quay for SalMar's smolt facility at Tjuin and extended the quay frontage at the quays in Follafoss.


At Tjuin, shallow water conditions required the construction of a 7 m wide pier extending from the shoreline to the quay front, together with two freestanding mooring dolphins on each side.


The pier has a reinforced concrete superstructure and was designed for truck traffic loading. The mooring dolphins are connected to the pier by steel pipe braces with access walkways above. On the landward side, the dolphins are supported by inclined steel core piles anchored into bedrock and enclosed in casing tubular steel piles. The pier itself is founded on steel core piles socketed into bedrock and provided with buckling-resistant tubular steel casing piles.


At Follafoss, one additional mooring dolphin was constructed for each quay. The dolphins are connected to the existing quays and anchored to gravity foundations located along the shoreline.


The design service life is 50 years.

Contract Type

Design and Build (Turnkey Contract)

Nyvoll Consult AS

Svein Ove Nyvoll

Client

Consto Anlegg Nord

Contact Person

Stian Svepstad Olsen