New pier for the smolt facility at Vågafossen, Vindafjord.

Scope

New pier with a 30 m quay frontage and an access bridge along the shoreline.

Specification

Nyvoll Consult AS was appointed as the structural engineering consultant by Consto Anlegg Sør for the construction of a new pier for Mowi Vågafossen in Vindafjord. The facility consists of a pier with a 30 m quay frontage and a longitudinal access bridge along the shoreline, as the site is both steeply sloping and confined.


The seabed consisted of exposed bedrock with slopes of up to approximately 60°. The foundation system comprises steel core piles with concrete-filled, buckling-resistant tubular casing. The projecting front skirt, main beams, deck elements, and quay edge were supplied as precast concrete elements and installed from a vessel. The entire installation was completed in just three days.


In addition, a dam with an intake structure and a Ø2.2 m fiberglass pipe was constructed to divert the Våga River beneath the facility.


The design service life is 50 years.

Contract Type

Design and Build (Turnkey Contract)

Nyvoll Consult AS

Svein Ove Nyvoll

Client

Consto Anlegg Sør

Contact Person

Roger Homdrom