Year
2016–2017
Size
Approximately 5,000 m² building, with two basement levels and eight stories above ground.
Scope
Design of reinforced concrete and steel structures.
Specification
In 2016, Nyvoll Consult AS was commissioned by WK Entreprenør AS to provide structural engineering services for Thereses gt 30. The building was designed using cast-in-place reinforced concrete, precast wall elements (shell walls), and filigree slab systems.
Parking facilities are located on Basement Level 2 (U2), commercial premises on Basement Level 1 (U1) and the ground floor, and residential apartments from the second to the eighth floor.
The parking basement, covering approximately 1,250 m², was constructed using cast-in-place reinforced concrete, precast shell wall elements, and filigree slabs. The building is founded on steel core piles extending to bedrock through zones of quick clay. A complete 3D seismic analysis and structural design were carried out using FEN-Design 3D Structure.
The structure was designed to maximize the use of Bamtec roll reinforcement.
Nyvoll Consult AS was appointed as the client's structural engineering consultant (RIB) throughout both the detailed design phase and the construction phase.
Construction started in 2016 and was completed in 2017.
Contract Type
Design and Build (Turnkey Contract)
Nyvoll Consult AS
Client
WK Entreprenør AS
Contact Person
Elvir Hazic