Sten & Strøm Egertorvet

New Rooftop Outdoor Stage

Year

2009

Size

Construction of a new outdoor stage above the existing roof.

Scope

Detailed design.

Specification

A new outdoor stage was constructed above the existing roof structure adjacent to the café on the sixth floor. The new deck was installed directly on the existing columns above the roof structure. As the adjacent plant room was partially cantilevered, some of the steel beams had to be installed through openings in the wall.


The new deck was constructed using structural steel beams and hollow-core concrete slabs.

Contract Type

Design and Build (Turnkey Contract)

Nyvoll Consult AS

Svein Ove Nyvoll

Client

BN Prosjekt AS

Contact Person

Bjørn Jonstad