Stadt Ship Tunnel – Concept and Tender Phase
Concept and Tender Phase
Year
2025–2026
Size
Ship tunnel with a length of 1,700 m, a navigable width of 26.5 m, and a navigable height of 33 m, including guiding structures.
Scope
Concept development of guiding and approach structures.
Specification
Repstad Anlegg AS is the contractor for Eiffage, one of the prequalified bidders for the Stadt Ship Tunnel project. Together with Dr. techn. Olav Olsen AS, Nyvoll Consult AS was engaged to develop the construction concept for the tunnel's approach and guiding structures, including fender systems and associated equipment.
The tunnel has a finished invert level of -13.25 m, a crown level of +36.75 m, and a width of 36 m. The work included developing constructible guiding structures within the tunnel, as well as guiding structures on both sides of the tunnel entrances. Particular focus was placed on the selection of fender systems in combination with the construction method and the concept for rock excavation.
Contract Type
Design and Build (Turnkey Contract)
Nyvoll Consult AS
Svein Ove Nyvoll
Client
Repstad Anlegg
Contact Person
Hans Christian