Removal and Dismantling of the Battleship Murmansk
Year
2009–2011
Size
Breakwaters comprising 250,000 m³ of rock fill and a 650 m sheet-piled dry dock.
Scope
Detailed design in collaboration with multiple project partners.
Specification
AF Decom AS was awarded the contract to dismantle and remove the battleship Murmansk, which had been stranded off the coast of Sørvær in Finnmark since 1994. The vessel, measuring 211 m in length with a deadweight of 17,000 tonnes, had a crew of 1,800. Due to the extremely exposed sea conditions and high waves, a protective breakwater was constructed around the wreck before establishing the dry dock. Once completed, the dry dock was dewatered before dismantling operations commenced. The project also included internal transport roads on the reclaimed dry seabed and a quay structure for the export of scrap metal.
Breakwater: 200 m + 250 m, constructed in water depths of up to 24 m, with a crest elevation of +6.75 NGO.
Dry Dock: 650 m of Z-profile steel sheet piling with a top elevation of +5.00 NGO.
Challenges: A geological fault zone passed through the dry dock.
Contract Type
Design and Build (Turnkey Contract)
Nyvoll Consult AS
Svein Ove Nyvoll
Client
AF Decom AS (Breakwater and demolition works)
AF Anlegg Havn AS (Dry Dock)
Contact Person
Vegard Pedersen
Lars Ivar Melland