Harbour Promenade along Sørengautstikkeren, Oslo

Year

2010–2011

Size

Harbour promenade at Sørengautstikkeren.

Scope

New quay structures in three sections with a total length of up to 300 m.

Specification

The project was originally tendered as a Main Contract. Due to the complexity of the construction, Nyvoll Consult AS developed an alternative concept with the same finished appearance as the original design but based on a different construction method. AF Anlegg submitted this alternative proposal in addition to the specified solution, and the alternative was selected due to its lower cost.


Nyvoll Consult AS was appointed as the design and build contractor's structural engineering consultant during the tender phase and was responsible for the design management throughout the detailed design and construction phases.


The project comprised of three quay structures along the western side of Sørengautstikkeren, connected by bridge spans. The quays were constructed as reinforced concrete beam-and-slab structures with adjacent timber piers. All structures are founded on driven piles socketed into bedrock.

Contract Type

Design and Build (Turnkey Contract)

Nyvoll Consult AS

Svein Ove Nyvoll

Client

AF Anlegg

Contact Person

Jarle Andreas Kristoffersen