Year
2016 – 2017
Size
150 m cruise ship quay with shore mooring facilities on both sides.
Scope
Cruise ship quay.
Specification
The new quay was constructed for Kristiansand Havn KF as the client under a Design and Build contract by ALTi Bygg og Anlegg AS. The facility was designed to accommodate cruise ships of various sizes, including Oasis-class vessels up to 360 m in length.
The quay provides a water depth of 12 m along the quay frontage and is founded on steel core piles socketed into bedrock with buckling-resistant tubular steel casing extending between the seabed and the superstructure.
The superstructure consists of reinforced concrete edge beams with intermediate precast deck elements. The quay is equipped with a purpose-designed fender system and 100-ton and 150-ton mooring bollards along the quay frontage. In addition, three freestanding 250-ton mooring bollards were constructed along the shoreline on each side of the quay. All structures, including the bollards, are directly founded on bedrock.
As the area has previously experienced landslides, the selected foundation method and structural solutions were chosen to minimise ground vibrations and avoid destabilising the surrounding soil beyond the existing conditions.
Nyvoll Consult AS was appointed as the structural engineering consultant to the design and build contractor and was responsible for the structural calculations and construction drawings for the entire quay.
Construction commenced in 2016 and was completed in 2017.
Contract Type
Design and Build (Turnkey Contract)
Nyvoll Consult AS
Svein Ove Nyvoll
Client
ALTi Bygg og Anlegg AS
Contact Person
Erdil Kenar