Repair of the Cruise Pier in Honningsvåg

Year

2017

Size

New foundation system and new quay deck.

Scope

Construction of a new quay deck using the existing deck as permanent formwork.

Specification

The existing cruise ship quay structure was struck by a cruise ship following a strong gust of wind during berthing. The projecting pier failed, causing the quay edge at the northwestern corner to move approximately 40 cm horizontally. The horizontal anchoring system of the projecting pier was also damaged, and the entire quay deck developed a continuous crack up to 20 cm wide extending towards the quay edge.


Repair of the damaged structure was assessed as impractical. A new horizontal bracing node was therefore constructed immediately outside the existing pier and new piles were installed through openings cut in the existing quay deck. A new reinforced concrete quay deck was then cast using the existing deck as permanent formwork.


In addition, the existing fender system was re-designed and replaced with a new fender system.

Contract Type

Design and Build (Turnkey Contract)

Nyvoll Consult AS

Svein Ove Nyvoll

Client

ALTI Bygg og Anlegg AS

Contact Person

Stig Lien