Vigeland Bridge

Year

2010–2011

Size

Foundation design and flood control for Vigeland Bridge in Lindesnes Municipality.

Scope

Verification of flood conditions during the construction period, as well as assistance with design and construction.

Specification

Vigeland Bridge is a new three-lane reinforced concrete bridge crossing the Audna River in the centre of Vigeland. The construction site is located in an area prone to flooding, and special attention was therefore given to flood management during the construction period.

 

Nyvoll Consult AS assisted AF Anlegg in adapting the foundation method and construction works to the river's water levels and flood conditions. In addition, Nyvoll Consult AS prepared procedures describing emergency preparedness and flood mitigation measures during the construction phase.

Contract Type

Main Contract

Nyvoll Consult AS

Svein Ove Nyvoll

Client

AF Anlegg

Contact Person

Gunnar Leirvik