Demoliton the Old Nautsundet Suspesion Bridge
Year
2009
Size
Suspension bridge with a length of 190 m.
Scope
Stability analysis during lifting operations and verification of lifting procedures.
Specification
AF Decom AS was awarded the contract for the demolition of the Old Nautsundet Suspension Bridge near Kongsberg. The bridge was dismantled by dividing the bridge deck into sections weighing up to 20 tonnes, which were then lowered using a mobile crane positioned on interconnected Flexifloat pontoons that could be transported individually by road. A 200-tonne Liebherr mobile crane was used together with a connected pontoon platform measuring 24.384 × 15.240 m.
Nyvoll Consult AS was responsible for the stability analysis during the lifting operations and for verifying the lifting procedures.
Contract Type
Main Contract
Nyvoll Consult AS
Svein Ove Nyvoll
Client
AF Decom Onshore AS
Contact Person
Vegard Pedersen