  • Calculations and design of structures in concrete, steel and timber.
  • Structural design of: buildings, quay structures, piers, communication structures (bridges and
    tunnels), foundations and rock anchoring, concrete technology, composite steel and concrete
    structures and dynamic effects.
  • Third party verification.
  • Durability of concrete structures.
  • Control of erection.


Education

1995 — Master of Civil Engineering (Structural), NTH
1992 — Structural Engineer, Møre og Romsdal Ingeniørhøgskole


Professional Experience

2008 – Now        Nyvoll Consult as

2004 – 2008        Dr.techn.Olav Olsen a.s, Project Engineer

2004 – 2004        Rambøll Norge AS (until 06.2004), Project Engineer

2000 – 2004        Scandiaconsult AS (Merged with Rambøll AS from 01.04.2004), Project Engineer

1998 – 1999        SCC Bonde & Co AS (Merged with Scandiaconsult AS from 01.01.2000), Structural Designer

1996 – 1998        Christie & Opsahl Entreprenør AS, Structural designer


Professional Membership

  • Norwegian Concrete Association, Committee for membership & meetings in Oslo.

  • Guidelines in design and maintenance of marine constructions. Norwegian Concrete Association

  • Norwegian Steel Association

  • RIF-member within constructing and buildings

  • PIANC (International Navigation Association).

  • PIANC Working Group 116 “Safety Aspects affecting the berthing Operations of Tankers to Oil and Gas Terminals” (Secretary). Publisert desember 2012.

  • PIANC Working Group 145 “Berthing velocities and Fender Design”


Additional Information

  • Lectures at the Norwegian University of Technology and Science (NTNU) in Subject: TBA4145 Port and Costal Facilities. 2012 and 2013

  • Supervisor in the diploma "Calculation of cracks in reinforced concrete structures" NTNU 2004.

  • External supervisor in the diploma "Development of design calculation program for systems with alternative layout" NTNU 2006.

  • Supervisor in the project-work "Multifunctional steel quay" NTNU 2012.

  • CMAS** Diving license

  • Mountain climbing


Professional Experience and Projects

2008 - Nyvoll Consult as, General Manager.

  • Kai B6 Sløvåg, Gulen. Design of very long composite columns with heavy loading for the new Pier adapted to Windfarm construction. Wergeland Group. 2023.

  • New Foundation for Nexans cable disc (5 200ton) alongside pier 3 at Øra, Fredrikstad. Borg Havn IKS. 2022 – 2023.

  • Capacity Control at Equipment pier East. Ulstein Verft Eiendom AS. 2022 - 2023

  • New dykdalb with access bridge and steel platform, new bollards at Øra Terminal in Fredrikstad, also including new bollards at Tollbodkaien. Port of Borg. 2022 – 2023.

  • New pier at Rødskjør in Harstad. New 122m steel sheet pier + dykdalb to lengthen quay-front. Port of Harstad. 2022 – 2023.

  • Pier at Elkem Kristiansand. Concept development and assistance at tender. Consto Anlegg Sør AS. 2022

  • Pier for Boliden, Odda. Concept development and assistance at tender. Repstad Anlegg AS. 2022

  • Borg Container terminal Pier 3, part 2. Quay-Construction and establishment of crane rails. Port of Borg. 2021 – 2022.

  • Søndre Bekkelagskai Oslo. Nes Femder System. Port of Oslo. 2022.

  • Kongsgårdsbukta Pier 6. Concept development and assistance at tender. Repstad Anlegg AS. 2022

  • New Drydock at Westcon Yards in Florø. Tender concept. Consto Anlegg Vest AS. 2022

  • New Foundation for Nexans cable disc (3 500ton) alongside pier 3 at Øra, Fredrikstad. Borg Havn IKS. 2021 – 2022.

  • New Pier for Salmar Fish Hatchery at Tjuin and construction works at two piers at Follafoss Fish Hatchery. Consto Anlegg Midt. 2021 – 2023

  • Dam Gåseflå. Pretension of Rock Anchors. Technical support. NRC 2021.

  • Esso Quay in Harstad. New Fender System. Port of Harstad. 2021 -.

  • Exposition of Kattegat III. Quays in Drammen. Harbour of Drammen. 2020-2021.

  • Ship Impact Barrier for Kaarbø Sea Hotel Harstad. Prodecon 2020 – 2022?

  • Skjerva Brigde Mosjøen. Detail design in Total Project. NRC. 2020 – 2021.

  • LNG Øra Fredrikstad. Foundations for LND tanks and LNG offshore loading arm. Gasum, 2020 – 2021.

  • Hydrovolt Fredrikstad. Structural Plant Description and owner support during erection. Norsk Hydro Energy AS. 2020 – 2021.

  • Boathouse with bedding and launching system for patrol boats on Sjursøya. Total contract NRC Anlegg as. From 2019 to 2020.

  • Railway bridge Disenå towards Kongsvinger. Assistance to NRC Construction. 2019.

  • Quay facility Vågafossen, Vindafjord Rogaland. Total contract Consto Construction South. Builder MOWI as. From 2019 to 2020.

  • Larsneset Quays Harstad. Detailed design and description of a new pier for Harstad Harbour KF including dredging. 2018-2022?

  • Equinor Terminal SRP Bahamas. Control of mooring analysis by Norconsult as. 2019.

  • Design of pleasure boat harbour. Saga Strand Boat Association. 2019.

  • Control of barge stability of Boabarge 15. NCC Industry as. 2019.

  • Control of loading and stability og the barge Tellus. Polar Transport as. 2019

  • Bridge Nordhaug Anchorage Ridesti. Complete design. Total contract NRC Construction 2019-2020.

  • New fender system at Honningsvåg Harbour. 2019.

  • Railway Venjar Eidsvoll. Pretension of steel sheet walls with self-designed jack. Hercules Foundation 2019.

  • Development of design software (Excel) for fibre reinforced slabs founded directly on piles. Mapei 2019.

  • New Fishing Pier in Utgårdkilen, Hvaler. Borg Harbour IKS. Tender description predesigns and detail design. From 2019 to 2020.

  • Containerkai North, Borg Harbour IKS. Tender description predesigns and detail design. 2019-2020

  • Sandefjord Ferry Terminal. Pivot fender for night-pier, new Duc d'albe with parallel fender wall and bollards. Color Line 2018 - 2019.

  • Mooring Analysis for Color Carrier in Kiel, Germany. Color Line 2018.

  • North and South Akershus Pier in Oslo. Feasibility study of repair techniques. Oslo Harbour KF 2018.

  • Sjursøya. New cement pump line for Norcem-plant. Oslo Harbour KF 2018.

  • Larsneset. Feasibility study for repair of existing quay. Harstad Harbour KF 2018.

  • Design of foundations for Cable Channel along Railway. NRC Rail 2018.

  • Rødskjær Harbour. Feasibility and possibility study. Harstad Harbour KF 2018.

  • Herre Timber Terminal. Repair of existing steel sheet quay. 2017 - 2018.

  • Stability of Barge with crane. NCC Industry AS, Herkules Fundamentering. 2018.

  • Moss Ferry Terminal. Contractor consultations on foundations. 2017.

  • Strømstad Ferry Terminal, Sweden. Adaption for new Vessels. ColorLine 2018.

  • New RTG Container storage Area for Borg Harbour IKS. 2017 - 2018.

  • Repair/new cruise pier in Honningsvåg. 2017-2018.

  • Foundations for passengers walk-way for the new ferry Color Hybrid in Sandefjord. 2017-2018.

  • Engelsviken Canning. Fredrikstad. Buildings at the coastline. 2017.

  • Strengthen and increase in loading conditions of pier 70, Borg Harbour. 2017

  • Ny Cruise pier at Lagmannsholmen, Kristiansand. 2016-2017.

  • Industrial plant; Kortbølgen 15B Norsk Batteriretur, Øra Fredrikstad. 2016-2017.

  • Repair of Rådhusbrygge 2 in Oslo. 2016-2017.

  • Snekkevik Kragerø. New Duc d'albe’s, bollards and fenders. 2016

  • Gismarvik Harbour. Tender consultations for ALTi Bygg og Anlegg as. 2016. The Project was not started before contract award.

  • New Duc d'albe, Øra Borg Harbour. 2016

  • New pier for Salmar, Gjørvika Senja. 2016.

  • Water supply in Askim, Eidsberg and Trøgstad Comunity. 2016

  • Repair of concrete dam. Water reservoir Halden, 2016.

  • Quay Pæddekummen Sarpsborg. Design 2015-2016.
  • Kronos Titan. Establishment of Constructed Wetland for existing acid tanks. 2015-2016.
  • Unger Factories. Establishment of Constructed Wetland for existing acid tanks. 2015-2016.
  • The New National Museum NPP. Technical assistance. 2015-2016.
  • Leiraveien 15/17, Lillestrøm. Offer Basics for expansion with 5000m2. 2015.
  • Jahrestranda Industrial Park. Study of harbour development in 2015.
  • KNM Narvik. Permanent arrangements as museum ship. 2015-2016.
  • Strömstad Harbour. Extension of existing quay and upgrading of existing fenders. 2012-2015.
  • Herre Timber Terminal in Telemark. 45m extension of existing quay. Predesign and the Terminals adviser in construction period. 2014-2015.
  • Sandnes Harbour. 45m extension of existing quay, Roro-ramp and fillings. The Harbours adviser during procurement and construction. 2012-2015.
  • Larvik Ferry Terminal. Repair damaged erosion protection. Color Line 2013-2014.
  • Alexela Sløvåg, Gulen Sogn og Fjordane. Independent control of new pier for oil tankers design class 3. From 2013 to 2014.
  • Floating Pier Park Sørenga, Oslo. Independent control of design. Design class 3. From 2013 to 2014.
  • Detail design of 152m container-quay in Borg Harbour in the extension of existing container-quay. 2013-2015
  • Extension Study of ship shock in the fairway in the Lower Glomma upstream Borg Harbour. Project in connection with the development next to the river. 2013.
  • Quay 5 Kongsgårdsbukta in Kristiansand. Detail design of 91m industrial quay in the extension of existing industrial-quay.
  • Statens Vegvesen Moss office building. Technical assistance in the preliminary stage 2013.
  • Development of Harbour-area in Strømsvika in Mandal. 2013.
  • Capacity assessment of existing quay in Harøysund, Romsdal in order to place an offshore crane with self-weight around 500tonn.
  • New Island ferry-terminal in Oslo Pipervika, Pier 4. From 2013 to 2014. Description, acquisition and monitoring during construction.

  • Containerkai Sjursøya Phase 2. Preliminary project / description of 361m long containerkai. Detailed design of foundations. 2012-2015.

  • Pilot project on industrial quay extension at Somaneset the north with approx. 120m length, and associated roro ramp. Sandnes Harbour KF, 2012-2013.

  • Container-terminal Glomfjord. Preliminary project. Terje Halsan AS. 2012.

  • 70m industrial quay at Lier terminal. Complete design, Project not initiated. 2012along the river of Mandalselva by Sanden in Mandal Centre. 2012.

  • Rehabilitation of steel sheet quay at Unicon Drammen. Concept development and description. 2012.

  • The Metro-centre in Lørenskog. Assistance for interface management between the overlying block and underlying Mall. 2012.

  • Strømstad Harbour. Modification of the current port for new ships with tube, ramp and dock customization. 2012

  • District heating Central Mysen, Østfold. Manufacturing Hall / concrete bunker. 2012

  • Svelgen Deep Sea Harbour, Bremanger, Sogn and Fjordane. Pilot project on offshore deep-water quay and facilities for the circulation of ships. 2012.

  • Rehabilitation of quay at Yara Glomfjord, Nordland. Assistance to AF Anlegg in adjusting to the concept / design ahead of the contract. 2011-2012

  • Pilot project to extend industrial quay / containerkai the south with approx. 152m at the Port Authority, Gauteng 2012.

  • New 200T Pullers for Cruise ships in existing quays in the Port of Stavanger. 2011-2012.

  • Steinshamn Industry-quay, Sandøy in Møre and Romsdal. Offer Basic. Total contract 2011-2014.

  • Pellets and oil Product Storage, Borg Havn. Pilot project 2011.

  • Årvollskogen 65, Rygge. Design of Industrial building 3 200m2. 2011-2012.

  • Årvollskogen 40, Rygge. Design of Industrial building 2 200m2. 2011

  • Sanden Brygge Mandal. Design of residential block 2011-2012.

  • Stoveland Bru Mandal. Demolition of existing bridge, design and erection of new bridge 2011.

  • Strømstad Havn, Sverige. New torsions fender including new foundation and new quay slab in steel. 2011.

  • Nedre Malme Pedestrian Bridge in Mandal. Foundation of new bridge 2011.

  • Rud High school, Bærum. New building 2010-2011.

  • Ski High School, Ski. Extensions 2010

  • Sandhamn Fishing Wessel quay, Sande in Møre and Romsdal. Offer Basic and detailed design of 104m quay. General contract 2010-2011.

  • 160m Pedestrian Bridge in Mandal. Alternative concepts and development of existing concepts. 2010.

  • Thor Dahl quays in Sandefjord. Concept development for AF Anlegg Havn 2010-2011.

  • Offshore Base for the AF group in Mandal. Concept Development 2010-2011.

  • Havneprominade Sørenga. Concept development of the turnkey Construction for AF Anlegg Havn, and engineering leader in the construction phase, 2010- 2011.

  • Ranyard Maritime, Rogaland. Design of quay. AF Anlegg Havn 2010.

  • Valen Bodø, Concept development of quay in turnkey contract. 2010.

  • Sydvaranger Industripark. Concept development and function description for complete offshore base in collaboration with AF Anlegg Havn. 2010.

  • Breakwater in Trelleborg, Sweden. Design assistance to AF Anlegg Havn. 2010

  • Vigeland Bridge, Vest Agder. Verification of the flood situation in the construction period. 2010.

  • Design of dredging in Västevik Sweden

  • ColorLine Terminal at Revet in Larvik. Repair of pier after ship collision. 2010

  • Aker Egersund. Design of new test pool for drilling equipment. 2010

  • New floating Cruise pier in Olden, Nordfjord. 2010

  • Gismerøya, Mandal. Assistance with planning and preparation of drilling rig service base. 2009-2010.

  • Frognerstanda 2. Assistance to contractor with rehabilitation of pier including construction of work raft. 2010

  • Vestbase Kristiansund. Alternative Predesign and new quay. 2010

  • Strømstad Harbour, Sweden. New torsions fender including new foundation. 2010.

  • Judaberg Ferry Quay. Hoisting assistance to contractor of 300-ton concrete elements. 2010

  • Kvitsøy Ferry Pier. Hoisting assistance to contractor of 300-ton concrete elements. 2010

  • Predesign of workshop and garage for Oslo Harbour 2009.

  • New 80m quay at Ulstein Verft in Møre and Romsdal 2009-2010.

  • Demolition of the inland suspension bridge “Gamle Nautesundet” including stability of barge and lifting operations. AF Decom 2009.

  • Removal and demolition of the stranded battleship “Murmansk” including dry dock and breakwater barrier. AF Decom/AF Anlegg Havn 2009-2011

  • Repair of existing pier in Ulvik, Hardanger, 2009.

  • New 126m quay at Larsnes Mek. Verksted in Møre and Romsdal 2009-2010.

  • New 80m quay at Ranyard Maritime in Randaberg. AF Anlegg Havn 2009- 2010.

  • 3 200-m2 Warehouse in Kristiansand. Design concept 2009.

  • Verpetveien 27, Vestby. New Warehouse. BN Prosjekt AS 2009-2010.

  • Sten and Strøm, Egertorvet, Oslo. New concert arena on top of existing building. BN Prosjekt 2009.

  • Horsøy Industrihavn A/S. New design. AF Anlegg Havn 2008-2008.

  • New Container quay at Revet in Larvik. New design. AF Anlegg Havn 2008- 2010.

  • New Container quay in Drammen. Assistance during erection. 2009

  • Production hall Aker Solutions. Foundations. AF Anlegg Havn 2008-2009.

  • Kongsgårdsbukta Kristiansand. Control of design. AF Anlegg Havn 2008- 2009.

  • Production hall Nexans Langhus. BN Prosjekt 2008.

  • Wave breaker in Ystad Sweden. New design. AF Anlegg Havn 2008.


2004 - Dr.techn. Olav Olsen a.s, Project engineer.

  • Dicks Veg 14, Bærum. New private pier for J.D. Ulletveit-Moe. 2008
  • Coast Center Base nearby Bergen. Alternative quay design. 2008
  • New Container quay in Drammen. AF Anlegg Havn. 2008.
  • New concrete pier. Norsk Metallretur, Skien. AF Skandinavia, Contractor.
  • New concrete pier. Aker Brevik Construction. AF Skandinavia, Contractor.
  • New Bulk terminal at Revet in Larvik. Larvik Harbour.
  • New Ferry Terminal for Color Line on Revet in Larvik. Larvik Harbour.
  • New concept for lighthouses in Drøbaksundet
  • Cargo terminal on Gismerøya in Mandal. Mandal Port of Agder.
  • Ferry terminal on Gismerøya in Mandal. Mandal Port of Agder.
  • Revierkaia quay. Oslo Harbour.
  • The Children Section. The New District Hospital in Akershus. Peab AS, Contractor.
  • Tjuvholmen. Durability of concrete structures
  • Sofies Hage. Apartments. AF Ragnar Evensen AS, Contractor.
  • Stovner Nursing Home. Oslo Health Division.
  • Technical approval for tunnel vault in fibreglass/aluminium. Ørsta Stål AS.
  • Report on new heliport for Haukeland Hospital (Bergen Health Division).
  • Reinforcement drawings on the submerged concrete tunnel in Bjørvika. Statens Vegvesen.
  • New Container quay (665m) on Sjursøya. Oslo Harbour.
  • Description for drilling of rock tunnels on the hospital A-Hus. PEAB.
  • Hausmann Street 23-25, Oslo. Office building. Olav Thon Gruppen.


1998 – 2004 Rambøll AS (Scandiaconsult AS/ SCC Bonde & Co AS), Project engineer.

  • Kilen Pier, Sandefjord. Pier and apartments on top of pier. AF-Gruppen 2003- 2004.
  • OPS E39 Lyngdal – Flekkefjord. Coordinator for the project group. Veidekke, 2003.
  • The New Norwegian Opera. Third party verification for the whole project. Statsbygg, 2002–2004.
  • Pedestrian bridge Nydalen, Oslo. Statens Vegvesen, 2002-2003.
  • Main road E6-Østfold, Sarpsborg. Two new crossing bridges and one culvert. Statens Vegvesen, 2002–2003.
  • Breivollveien 31. Office building, Oslo. Stenshagen Holding, 2002.
  • Parking house/heliport, Ullevål Hospital Oslo. AF-Ragnar Evensen AS, 2002. Not induced
  • Oddernestunnel, Buried concrete/steel sheet tunnel in Kristiansand. Veidekke, 2001-2004.
  • Parking House SiA Hospital. AF Ragnar Evensen AS, 2001.
  • Bjølsenhallen. Rehabilitation. 2001.
  • The Innovasjon-Center. New research institution. Ing. Gunnar m. Backe AS, 2000–2001.
  • New headquarter for Telenor on Fornebu. Telenor Eiendom, 1999–2000.
  • High school of Art in Oslo. Brødrene Jenssen, 1999–2000.
  • Lindum Ressurs and Gjenvinning. Compost plant. Veidekke, 1999. Not induced.
  • BIR, Bergen. New disposal plant Bergenshalvøens Interkommunale Renholdsverk, 1998–1999.


1996 - 1998 Christie & Opsahl Entreprenør AS, Project engineer.

  • Extension Kvalheim Laundry A/S. 1998.
  • New Pier. Vedde Fish oil and Fishmeal A/S. 1998.
  • Extension administrations building. Aukra Industrier A/S. 1997–1998.
  • Extension Molde Police Office. Planor Prosjekt A/S. 1997.
  • New production hall. Heimdal Eiendom A/S. 1997.
  • Foundations for rock plant. Visnes Kalk and Marmorbrudd A/S. 1997.
  • New pier. Statens Vegvesen / Ullasund Småbåtlag. 1997.
  • New repair shop/office. Langnes Marmorbrudd A/S. 1996–1997.
  • New production hall. Sylteosen Betongvarefabrikk A/S. 1996.
  • Noise control of rock shatters plant. Visnes Kalk and Marmorbrudd A/S. 1996.